We think we have the coolest job. At this Coal Plant, we had 10 EJ splices to do. All requiring us to be tied in with access only possible by lift, scaffolding, or stairs. These Rubber EJs had to be heat cured, meaning we had an INTEREP crew working around the clock for 4 days. This was a fun one. 😆 check out our Instagram for more pictures of this job. @interep.inc